The Process
How it works
We build the place first, then film it. Seven stages you approve before the next begins.
We built our own web app to run production, driven by Claude Code and our own custom skills, so every reference, scene, shot and clip for your development sits in one place under one set of rules, and a revision comes back in a day.
-
01
References
Whatever you have. No CGIs needed.
CGIs, if any Site photos today Sketches Mood boards Room dimensions Planning documents -
02
Scenes
Every space becomes one finished frame: the arrival, the lobby, a bedroom, the roof terrace.
Locked before anything else runs Clean daylight, no grade yet -
03
Sheets
Each approved scene, produced again from the other angles. This is what keeps a space believable once the camera moves through it.
Across the room From the doorway Close on materials -
04
Shots
Now the photography. Every shot is generated from the scene you signed off, so it's the same place, shot artistically.
Inspired by luxury hotel videos Any time of day or weather People or empty Revisions only take a day -
05
Animations
Each approved shot becomes a moving clip. The camera drifts, water moves, light shifts, people walk through.
5 seconds standard Up to 15 seconds -
06
Edits
The clips are cut to the track and graded shot to shot, so the film reads as one piece rather than a run of clips.
Music Sound Voiceover -
07
Delivery
The film fronts the campaign and the investor pack, the cuts and loops run on social, email, the sales suite and the screens, and the stills carry the deck, the portals, the brochure and the hoardings. All of it out of the same scenes, so everything matches.
Launch Film Social Cuts & Loops Stills Library